What is a septic site and soils evaluation in California?

By Jennifer Bardenheuer, REHS

Before a septic system can be designed, someone has to find out whether the ground can handle it, and where. That’s the job of the site and soils evaluation. It’s usually the first step in any septic project.

In California, septic systems (onsite wastewater treatment systems, or OWTS) are regulated locally. Each county’s environmental health department permits them under state standards and its own local rules, so what the county asks for during an evaluation can differ from one county or jurisdiction to the next.

Who needs one?

You’ll likely need a site and soils evaluation if you’re:

  • Building a new home on a parcel without public sewer.

  • Adding an ADU or bedrooms that may need a new or larger system.

  • Splitting a lot, where each new parcel may need to show it can support septic.

  • Buying vacant land and wanting to know whether it can be built on.

  • Repairing or replacing a failing system, where the new system needs a suitable spot.

What happens in the field

Every site is different, but the work generally starts with:

  1. Records and rules. I start by checking what the county has on file for your parcel and what that county’s rules require. Because every California county runs its own program, I don’t assume.

  2. Walking the site on the day of the evaluation. I look at slopes, drainage, wells (yours and the neighbors’), creeks and ponds, vegetation, easements, and where the house and driveway might go. I’m also looking at setbacks, the distances a septic system has to stay from those features.

  3. Soil profile holes. An excavator digs test holes so I can see what’s under the area where the leach trenches would go. As a general rule in California, I need to know what’s at least 5 feet below the bottom of the proposed leach trench, to make sure there are no limiting factors such as excessive rock or groundwater. The exact depth can vary by jurisdiction. I describe each soil layer in the walls of the hole (its texture, structure and color) and watch for signs of a seasonal high-water table, bedrock, or a hard or tight layer that water can’t move through.

  4. Marking a usable area. The goal is to find an area that meets your vision for the land, as well as the soil and setback requirements for the primary leach field, plus a reserve area for a future replacement.

What to expect on the day

  • An excavator on site. I coordinate the excavator as part of testing. The equipment needs a way in, so a rough path or driveway that a backhoe or small excavator can reach is helpful.

  • Time in the field. A simple site may take a few hours.

  • County staff may attend. Some counties want to witness the profile holes, so the day may be scheduled around their calendar.

  • Marking what’s underground. Before any digging, you need to call 811, California’s call-before-you-dig service, so public utility lines get marked. 811 doesn’t mark private lines, so please also mark any buried power, water or gas lines you know about, plus your well and any existing septic tank or leach field.

  • Property corners. If you know where your property lines or corners are, flag them. Sanitary setbacks are based off of the legal parcel lines. If you aren’t sure, sometimes it’s best to have a survey of the site before we set an appointment.

  • Join me if you can. I always prefer that owners are onsite the day of the evaluation, if possible.

Timing and the season

When testing happens can matter. Some counties have specific times when evaluations can occur; others allow evaluations to be performed year-round. If you’re on a deadline, like a purchase contingency, talk to me about scheduling early.

What comes out of it

After the field work, I prepare a report of my findings: what the soil profiles showed, groundwater or other limits, and what that means for a septic system on the site. I also prepare a base map showing the site features, setbacks and the usable primary and reserve areas.

That report and map are used in the septic design and the county permit application. If the site has limits, they also show whether a conventional system can work or an alternative may be needed.

It’s one part of the septic design, not the final plan

A site and soils evaluation is one part of the overall septic design process, not the final plan. Further testing may be needed for county approval. The locations on the base map are preliminary until the system is designed and the plans are drawn and reviewed by the county.

Let’s find out what your site can support

I conduct site and soils evaluations across California, including Tuolumne, Calaveras, Mariposa, Yolo, Amador, Mono, Contra Costa and Alameda counties.

If you have a project in mind, give me a call at (209) 536-8048. We can talk through your site and the best next step.

— Jennifer Bardenheuer, REHS

Next
Next

To add on, or not to add on?